Home  |  Careers  |  About NDOT  |  Planning  |  Public Involvement  |  News  |  Documents  |  Help
NDOT U.S. 395 North Valleys Project logo

Traffic Control Week of Sunday, November 12, 2023

Drivers Encouraged to Plan Ahead As NDOT Launches Multi-year Improvements to U.S. 395 North Valleys

Dear Stakeholder,

You are receiving this update because you are an important stakeholder on Nevada Department of Transportation’s (NDOT) U.S. 395 North Valleys Project. Construction will begin on Sunday, November 12, 2023 at 8 p.m. on northbound U.S. 395 between North McCarran Boulevard and Golden Valley Road. The majority of construction operations can be expected Sunday nights through Saturdays. This is a multi-year project with anticipated completion in 2025.

Traffic Control Week of Sunday, November 12, 2023

Closed

The following ramps will be closed overnight from 9 p.m. on Sunday, November 12 to Monday, November 13 at 5 a.m. Please use detours.

  • McCarran Blvd. on ramp to northbound U.S. 395
  • Clear Acre Lane on ramp to northbound U.S. 395
  • Northbound U.S. 395 off ramp at Parr Blvd.

Ongoing

Speeds will be reduced to 55mph 24/7 through the work zone, with lanes slightly shifted.

Through winter, all lanes are anticipated to remain open for travel during daytime commute hours.

  • Lanes will be reduced to a minimum of one lane in each direction:
    • Northbound U.S. 395: between 8 p.m. and 11 a.m.
    • Southbound U.S. 395: between 7 p.m. and 5 a.m.
  • Intermittent ramp closures will take place between 9 p.m. and 5 a.m.
  • No two consecutive ramps will be closed in the same direction, and detour routes will be marked.

Please Note:

  1. Message signs will be in place notifying motorists of the work activities.
  2. Expect delays and use alternate routes when possible.

Sign-up to receive text alerts at https://slkt.io/YSd4, or text “NorthValleys” to 866-540-8466.

CONTACT US WITH ANY QUESTIONS

FACEBOOKwww.facebook.com/NevadaDOT
TWITTER: @nevadadotreno
HOTLINE: 775-636-4202